国产三级日本三级在线播放-国产三级三级三级-国产三级三级三级av精品-国产三级视频-国产三级视频在线-国产三级视频在线观看视主播

您好,歡迎訪問廣西華工重工升降設備廠官網!

廣西華工重工升降設備廠

 多年以來一直專注于生產銷售液壓升降機械設備

全國24H熱線服務電話:

188-7888-1055

您當前的位置 :首 頁 > 客戶案例 > 登車橋有哪些檢查要點?

登車橋有哪些檢查要點?

2022-11-16 16:13:18
1109次

1、檢查登車橋http://m.russiantour.cn/所有的液壓管道和接頭。管道不能有破損,接頭不能有松動,必須將所有接頭擰緊。
Ramps Check all hydraulic pipes and fittings. Pipes can not have broken, can not have loose joints, all joints must be tightened.

2、卸下并拆開登車橋下降閥,用壓縮空氣將柱塞吹凈,然后裝入,重新安上。
Remove and disassemble Ramps lowering valve, with compressed air blowing the plunger, then loaded reattach.

3、把登車橋液壓油放盡棄掉,擰緊接頭取出油過濾器,洗清后,用壓縮空氣清理干凈,然后放回油箱,并連接好管路。
The hydraulic oil Ramps exhausted discarded, tighten the fitting Remove the oil filter, after cleared with compressed air to clean up, and then back into the tank and connected piping.

4、登車橋http://m.russiantour.cn/全程升起,在這位置時,液壓油面應高出箱底40~50毫米。
Ramps full rise, in this position, the hydraulic oil level should be higher than the bottom 40 to 50 mm.

快速導航

· 產品展示                · 客戶案例              

· 廠容廠貌                · 新聞動態              

· 行業知識                · 常見問題             

· 關于我們                · 聯系我們             

聯系我們

公司名稱:廣西華工重工升降設備廠

聯系人:鄭經理

手機號:18878881055

座機:0771-3366627

郵箱:584649766@qq.com

地址:廣西南寧市青秀區仙葫經濟開發區開天路23號

手機移動端

微信掃一掃

主站蜘蛛池模板: 日本高清中文字幕在线观穿线视频 | 国内外一级毛片 | 狠狠色婷婷综合天天久久丁香 | 奇米777视频二区中文字幕 | 欧美成人性视频播放 | 波多野结衣中文字幕久久 | 中文乱码字幕午夜无线观看 | 日韩 欧美 亚洲 | 中文字幕亚洲专区 | 国内精品久久久久影院一蜜桃 | 精品久久久久久久 | 精品国产综合成人亚洲区 | 麻豆成人久久精品二区三区小说 | 五月亚洲 | 特黄特黄aaaa级毛片免费看 | 久久综合一 | 欧美日韩一区二区高清视 | 天天躁日日躁aaaaxxxx | 伊人久久久综在合线久久在播 | 日本九九视频 | 青青热久久国产久精品 | 黄色不良视频 | 日日夜夜操操 | 久久777国产线看观看精品卜 | 97xxxx| 美国一级毛片片aa成人 | 五月四房 | 精品国产综合区久久久久久 | 在线播放国产一区 | 久久96精品国产 | 日本欧美三级 | 又黑又粗又硬欧美视频在线观看 | 日本不卡在线视频高清免费 | 欧美亚洲国产精品久久第一页 | 国产精品天堂 | 337p色噜噜人体大胆欧美 | 91亚洲最新精品 | 五月婷婷视频在线 | 四虎最新紧急更新地址 | 天天久久狠狠伊人第一麻豆 | 久久网免费视频 |